News and Updates
Major Improvements Underway on East Hill and St Botolph’s Corridor

East Hill and St Botolph’s Transport Improvements Progress

Work is now underway on two significant transport improvement projects in Colchester, with construction progressing on both the East Hill walking and cycling scheme and the St Botolph’s Circus regeneration project. Together, these schemes aim to improve how people walk, cycle and travel through one of the city’s busiest transport corridors.

The projects form part of wider efforts to create a safer, more accessible and better-connected city centre, helping more people choose sustainable transport options for everyday journeys.

Improving Connections Between the City Centre and University

Construction began on the East Hill walking and cycling scheme in July and is expected to continue through to mid-2027. The scheme is designed to create a safer and more attractive route linking Colchester city centre with the University of Essex, Greenstead, Hythe and future developments in the east of the city.

The route will provide improved facilities for people walking and cycling, helping to connect residential areas, employment sites, educational facilities and public transport hubs. It will also link into existing cycling infrastructure, including the Wivenhoe Trail and National Cycle Route 51.

What is being delivered:

  • Cycle infrastructure along the length of East Hill, supporting safer and more convenient cycling.
  • Modern upgraded bus stop infrastructure, including new shelters, raised kerbs for improved accessibility, and real-time passenger information.
  • Relocation of tourist coaches away from East Hill to ease congestion and the number of vehicles waiting for long periods of time.
  • High quality pavements to improve accessibility, including natural stone paving within the city walls to enhance and complement the existing look and feel of the conservation area.
  • Safer, raised footpath crossings at side roads to prioritise pedestrians and reduce vehicle speeds.
  • An upgraded crossing, converting the existing zebra crossing into a parallel crossing for use by both pedestrians and cyclists.
  • Improvements to the Guildford Road junction to enhance safety and traffic flow.
  • Managed parking changes, retaining key spaces near the church while ensuring continued access for deliveries, loading, unloading and Blue Badge holders.
  • A new 20mph speed limit along East Hill

View looking up East Hill from outside St James’ Church / Artist impression / From Essex Highways

By making active travel routes safer and more convenient, the scheme aims to encourage more residents, commuters and students to consider walking or cycling for everyday journeys.

Find out more

Progress at St Botolph’s Circus

At the same time, work is progressing on the regeneration of St Botolph’s Circus, one of Colchester’s key gateways between the railway station, city centre and eastern neighbourhoods. Recent updates indicate that construction is advancing well following the appointment of the main contractor.

Key elements of the design:

  • Removal of the outdated underpasses to help improve accessibility and safety for pedestrians.
  • New surface-level crossing points on each arm of the junction, making it easier and safer to access the city centre.
  • The creation of new high-quality plaza areas to improve pedestrian experience and remove pinch-points.
  • Space for a kiosk /pop-up business opportunity maximising the economic opportunity offered by increasing footfall./li>
  • Dedicated cycling facilities to create a better balance between road users and connect cyclists to the wider network.
  • New landscaping and public realm to improve the look and feel of the area and create an area people can spend time in.

Facing the roundabout from St Botolph’s Street / Artist impression / From Essex Highways

The improvements are intended to enhance the public realm, improve accessibility and create a more attractive environment for people travelling on foot, by cycle and by public transport. Together with the East Hill scheme, the project will help deliver a more coherent and connected sustainable transport network across the city.

Find out more

Mitigating the impact

Although the projects will lead to an overall improvement to walking and cycling in Colchester, some temporary disruption is inevitable during construction including traffic congestion that might impact deliveries.

Help to mitigate the impact for your organisation by trying an alternative delivery service instead. Colchester eCargo uses electric cargo bikes to transport goods efficiently across the city. By consolidating deliveries and reducing the number of larger vehicles travelling through busy streets, eCargo services can help businesses maintain reliable deliveries while supporting cleaner air, lower congestion and a more pleasant environment for everyone using the city centre.

CTPC members can access a free trial of their service, so get in touch today to see how they can help!

Book a delivery by eCargo bike

Share
We would appreciate if you can respond to this city-wide survey about bus travel in Colchester and share it throughout your organisation and with your contacts.
Catch up on: Extra train stops for Colchester Summer Series, Park & Ride to Colchester Summer Series, Public health funding opportunity, East Hill works update, St Botolph's works update, Bus service updates, Sustainable Futures free event.